| home > Product >
Designing Your System >
Selecting a Pillow Location
Selecting A Pillow Location
Drawing/Designing Your System on blank template
-
Mark your crawl space supports & walls or deck supports & walls. Pillow must have a minimum of 6 inches of total clearance around all sides and top of a full pillow.
-
Mark overhead pipes, AC ducts, water/sewer pipes, gas pipes and any others that cross the pillow location. Full pillow height must be 6 inched below any pipe obstruction.
-
Access to and around pillow - must be able to access all fittings when the pillow is full.
-
Filter access - from filter located outside to pillow fill port
-
Filter overflow
-
Pillow Overflow
-
Will the overflow hose be directed out the crawl space vent, directly thru the foundation, into a crawl space drain system, or connected to a sump pump system?
-
Gravity drains the water out of the overflow so the overflow pipe must be at or below the full pillow height
-
Electricity - standard pump is 7amps and 115 volts, 6 foot cord
-
Pillow Fitting Locations - Best if fill and Pump ports are located on opposite sides of pillow.
-
Overflow drain must be located on center top of pillow
-
Fill Port - 3” female thread
-
Pump Port - 2” female thread
Ready to get started? Download our schematic and fax it back to get your order processed.
FAX 770.667.9918
|